Chamsil Galleria Palace | |
---|---|
Order | Samsung C&T Construction / Hanwha Engineering&Construction |
Volume | 46F/150 M 5 buildings S.R.C Concurrent placement |
Inputted equipment | T/C :30 Ton(2),12 Ton(5 EA)- Total7 EA- L/C :High speed(TWIN,5 EA) Low speed(2 EA)- Total7 EA-High Pressure ConcretePUMP: 5 EACPB:5 EA |
Input time | 2002.05 ~ 2004.05 |