Business Performance

Tower crane operation performance

WooMyeon R&D Center
Order Samsung C&T Corporation.
Volume Basement 5th , Above ground 8th/10th Steel concrete, Construction area 26,729㎡
Inputted equipment 32 Ton(1 EA,L-Type), 24 Ton(6 EA,L-Type), 18 Ton(4 EA,L-Type)
Input time 2013.04 ~ 2014.11
LIST

LIST