Business Performance

Tower crane operation performance

SongDo Edison 2nd New Construction
Order Samsung Engineering
Volume 1st~4th Fl.
Inputted equipment 32 Ton(2 EA,T-Type), 20 Ton(2 EA,T-Type)
Input time 2013.11 ~ 2014.08
LIST

LIST