Business Performance

Tower crane operation performance

PyeongTaek Office 2 Pavillion
Order KCC ENGINEERING & CONSTRUCTION CO., LTD.
Volume Basement 1st Fl.~Above ground 12th Fl. Constructed area 10,975㎡
Inputted equipment 32 Ton(2 EA,L-Type), 48 Ton(1 EA,Topless-Type) 32 Ton(1 EA,T-Type)
Input time 2018.02 ~ 2019.11
LIST







LIST