Mapo HanHwa Obelisk | |
---|---|
Order | Hanwha Engineering&Construction |
Volume | 37F/110M 2 buildings R.C Concurrent placement |
Inputted equipment | T/C :20 Ton(2),12 Ton(1) - Total3 EA- L/C :High speed(SINGLE,2 EA) Low speed(5 EA)- Total7 EA-High Pressure ConcretePUMP: 2 EACPB:3 EA |
Input time | 2002.10 ~ 2004.06 |