Business Performance

Tower crane operation performance

Hanam Techno Valley U1 Center
Order DAEWOO ENGINEERING & CONSTRUCTION Co., Ltd.
Volume Basement 2nd~15th Fl.
Inputted equipment 14 Ton(3 EA, T-Type), 18 Ton(2 EA, L-Type)
Input time 2017.05 ~ 2019.02
LIST



LIST