Business Performance

Tower crane operation performance

HeungDeok IT Valley
Order Samsung Heavy Industries Co., Ltd
Volume Basement 3rd Fl., Above ground 40th Fl. (180.7M) Lot area 36,278.1㎡(10,974 Pyeong)
Inputted equipment T/C 32 Ton(2 EA) T/C 8 Ton(3 EA) High speed L/C TWIN 1 EA Con'C PUMP 1 EA PLACING BOOM 1 EA
Input time 2011,05 ~ 2013.04
LIST



LIST