Order |
Samsung Heavy Industries Co., Ltd |
Volume |
Basement 3rd Fl., Above ground 40th Fl. (180.7M) Lot area 36,278.1㎡(10,974 Pyeong) |
Inputted equipment |
T/C 32 Ton(2 EA) T/C 8 Ton(3 EA) High speed L/C TWIN 1 EA Con'C PUMP 1 EA PLACING BOOM 1 EA |
Input time |
2011,05 ~ 2013.04 |