Yeoido Lotte Castle Ivy | |
---|---|
Order | LOTTE ENGINEERING & CONSTRUCTION |
Volume | 33F/120M 2 buildings S.R.C CORE preceding TOP DOWN |
Inputted equipment | T/C :16 Ton(2),20 Ton(1)- Total3 EA-L/C :High speed(TWIN,2 EA) Low speed(3 EA)- Total5 EA-High Pressure ConcretePUMP: 2 EACPB:2 EA |
Input time | 2003.10 ~ 2005.04 |