DoGokDong Tower Palace (I) | |
---|---|
Order | Samsung C&T Construction |
Volume | 66F/233M 4 buildings S.R.C CORE preceding |
Inputted equipment | T/C :30 Ton(3),20 Ton(9), 12 Ton(2)- Total14 EA- L/C :High speed(TWIN,8 EA) Low speed(6 EA)- Total14 EA-High Pressure ConcretePUMP: 5 EACPB:2 EA |
Input time | 1999.10 ~ 2001.12 |