Business Performance

Tower crane operation performance

Siheung Plum Blossom Knowledge Industry Center
Order LEAD CONSTRUCTION
Volume 9th floor PC & steel frame
Inputted equipment T/C : 40T T-Type (1),48T T-Type (1) Total2 EA
Input time 2020.03 ~ 2021.01
LIST



LIST